Sample Landed Costs
The Landed Cost module calculates the total cost to produce a sample, including materials, labor, and any additional expenses.Where to find itOpen any sample and look for the Landed Cost card on the sample detail page.
Cost Components
Materials Cost
Materials Cost
Automatically calculated from your three material entries:
- Leather cost
- Accessories cost
- Lining cost
Labor Costs
Labor Costs
Based on the rates you set on the sample:
- Stitcher Rate × Quantity = Stitching cost
- Fuser Rate × Quantity = Fusing cost
Additional Costs
Additional Costs
Optional extras you can add manually:
- Packaging
- Special finishing
- Testing fees
- Any other costs
Currency Display
Costs are shown in both currencies:| Currency | Use |
|---|---|
| PKR | Local production costs, labor rates |
| GBP | Customer pricing, export invoicing |
Exchange rates update automatically. The current rate is shown at the top of the Landed Cost card.
Per-Unit Cost
The system calculates the cost per unit:FOB vs CIF
For samples, you’ll typically work with:| Term | Meaning |
|---|---|
| FOB | Free On Board – cost to get the sample ready for shipping |
| CIF | Cost, Insurance & Freight – includes shipping to customer |
Labor Rates and Production
When you convert a sample to production, the stitcher and fuser rates carry over to the production order. These rates then apply to job cards, determining worker pay for each unit produced.Example Breakdown
| Component | PKR | GBP |
|---|---|---|
| Leather | 2,500 | £7.14 |
| Accessories | 800 | £2.29 |
| Lining | 400 | £1.14 |
| Materials Total | 3,700 | £10.57 |
| Stitching (150 × 2) | 300 | £0.86 |
| Fusing (50 × 2) | 100 | £0.29 |
| Labor Total | 400 | £1.14 |
| Packaging | 200 | £0.57 |
| Grand Total | 4,300 | £12.29 |
| Per Unit (÷2) | 2,150 | £6.14 |
Related
Production Landed Costs
Full costing for production orders including labor and material costs