Documentation Index
Fetch the complete documentation index at: https://help.macleather.co.uk/llms.txt
Use this file to discover all available pages before exploring further.
Creating Purchase Orders
This guide covers how to create new purchase orders, fill in required fields, and link POs to sample materials.Two Ways to Create a PO
| Method | When to Use | Link to Sample |
|---|---|---|
| From Procurement page | Standalone purchases | Manual (optional) |
| From Sample Material | Material for a specific sample | Automatic |
Method 1: Create from Procurement Page
Location: Sidebar → Procurement → + New POMethod 2: Create from Sample Material
Location: Sample Detail → Materials tab → Select material → Create POWhen you create a PO from a sample material:
- Category auto-fills based on material type
- Link to sample is created automatically
- Material status updates when PO is approved
PO Form Fields
Required Fields
| Field | What to Enter | Example |
|---|---|---|
| Supplier | Select from dropdown | Leather House Ltd |
| Category | Material category | Leather |
Optional Fields
| Field | What to Enter | Example |
|---|---|---|
| Notes | Additional information | Urgent order, call before delivery |
| Expected Date | When materials expected | 2026-02-15 |
Item Fields
Each item you add requires:| Field | What to Enter | Example |
|---|---|---|
| Description | What you’re ordering | Full grain black leather |
| Quantity | Amount needed | 50 |
| Unit | Unit of measure | meters |
| Unit Rate | Price per unit (PKR) | 1500 |
Selecting a Supplier
Selecting a Category
| Category | Use For |
|---|---|
| Leather | Main leather materials |
| Accessories | Hardware, zips, buckles, rivets |
| Lining | Interior fabrics and materials |
| Mixed | Multiple material types in one PO |
| Other | Miscellaneous purchases |
When creating from a sample material, category is auto-selected:
- Leather material → Leather category
- Accessories material → Accessories category
- Lining material → Lining category
Adding Items to PO
Adding Multiple Items
Repeat the Add Item process for each material. Total cost auto-calculates. Example PO with multiple items:| Description | Qty | Unit | Rate | Total |
|---|---|---|---|---|
| Full grain black leather | 50 | m | 1,500 | 75,000 |
| YKK metal zip 20cm | 100 | pcs | 45 | 4,500 |
| Cotton lining black | 30 | m | 200 | 6,000 |
| PO Total | 85,500 |
Uploading Documents
You can attach documents to the PO (quotes, supplier invoices, etc.).Supported Formats
| Format | Accepted |
|---|---|
| Yes | |
| JPG/JPEG | Yes |
| PNG | Yes |
| XLSX/XLS | Yes |
Saving the PO
Save as Draft
What happens:- PO created with Draft status
- PO number assigned (PO-YYYY-XXX)
- You can edit anytime while Draft
- Not yet sent for approval
Save and Submit
What happens:
- Status changes to Pending Approval
- Sent to approver based on amount
- PO locked for editing
After Creating the PO
| Status | What You Can Do |
|---|---|
| Draft | Edit, add items, delete, submit |
| Pending Approval | Wait for approver |
| Approved | View, download documents |
| Rejected | Edit, fix issues, resubmit |
Checking PO Status
Location: Procurement → Find PO row → Status column Or: Procurement → Click PO → Status badge in headerCommon Scenarios
| Situation | Action |
|---|---|
| Need PO for sample material | Sample Detail → Materials → Create PO |
| Ordering from new supplier | Add supplier first, then create PO |
| Multiple materials, one supplier | Create single PO → Add multiple items |
| Need to order urgently | Create PO → Submit immediately |
| Want to prepare PO but not send | Save as Draft → Submit later |
| Made mistake on submitted PO | Ask approver to reject → Edit → Resubmit |
Troubleshooting
Supplier not in dropdown
Supplier not in dropdown
Cause: Supplier not added to system.Solution: Add the supplier first. Go to Suppliers → Add Supplier, then return to create PO.
Can't submit PO
Can't submit PO
Cause: Missing required fields or no items.Solution:
- Check supplier is selected
- Check category is selected
- Ensure at least one item is added
Wrong category selected
Wrong category selected
Cause: Selected wrong category before saving.Solution: If Draft, edit and change category. If Submitted, ask approver to reject first.
Item total showing wrong
Item total showing wrong
Cause: Quantity or rate entered incorrectly.Solution: Edit the item → Correct quantity or rate → Total recalculates.
Can't find created PO
Can't find created PO
Cause: Filters hiding the PO.Solution:
- Go to Procurement
- Clear all filters
- Sort by Created date (newest first)
PO not linking to sample
PO not linking to sample
Cause: PO created from Procurement page, not sample.Solution: For auto-linking, create PO from Sample Detail → Materials tab. Manual linking not supported.
Related Guides
PO Detail Page
Full page reference
Approval Workflow
Submitting for approval
Suppliers
Managing suppliers
Material Workflow
Sample materials